

I’m talking about Gravelines in France. The first reactor was plugged into the national grid 6 years after construction began. The 6th reactor in 1985.
The EPR2 is already designed, and in service in Flamanville. Flamanville 3 took a long time because we had to rebuild our whole nuclear industry, by lack of political vision back in the 90’s-00’s.
We’re building it again, two by two this time, and hopefully in less than half the time and budget.
That’s the great thing about trickle down economics, when it goes up, they get richer and we get poorer. When it goes down, we get poorer and they get richer !